Unit 313 Professional Discussion — Preparation Guide

Upload the genuine job documents first, then use this guide to prepare to explain how the job was planned and organised.

Before the discussion

Upload the job paperwork to OneFile.

Put the relevant genuine documents into Assessment Evidence before the Unit 313 PD. I need the paperwork available so the discussion can be based on the real job.

Company-generated documents are fine. Do not rewrite or backfill company paperwork just to make evidence. Be ready to explain how you received it, checked it and used it.

Typical documents

  • Job sheet / works order
  • Specification and/or drawings
  • Risk assessment
  • Method statement
  • Programme of work
  • Materials/resource information
  • Delivery/collection information where relevant
  • Relevant changes, variations or supervisor instructions

Questions about the information you worked from

What was the job and what were you asked to do?

Explain the scope in plain English and your own responsibilities on the job.

What information did you receive before starting?

Talk about the actual job sheet, works order, drawings, specification, RAMS, programme or supervisor/client information you genuinely had.

How did you use the drawings or specification?

Explain what you checked: locations, routes, equipment, quantities, requirements, interfaces or anything else relevant to your job.

Who produced the RAMS / programme / company documents?

Be accurate. If the company produced them, say that. Then explain what you did with them: read them, checked your work against them, followed controls, raised a query, etc.

What would you do if the drawing and the site did not match?

Explain how you would stop and clarify the issue with the appropriate person rather than guessing or making an unauthorised change.

Planning and sequence questions

How was the job broken down into a sensible sequence?

Explain the order of work: access/preparation, containment, cables, equipment, termination, inspection/testing and any dependencies that applied.

Good answer: explain the real sequence and why that sequence made sense on this job.

How did the programme of work affect what you did?

Talk about dates, priorities, work areas, other trades, shutdowns, client access or deadlines where these genuinely affected the job.

How did you know what should be completed first?

Base the answer on the programme, site conditions, instructions, drawings/specification and coordination with others.

How did you organise your own work area?

Think about access, safe storage, housekeeping, tools/materials, keeping routes clear and coordinating with other people.

Materials, tools and resources

What materials and equipment did the job need?

Name the actual materials relevant to the job and explain how quantities/specification were checked.

How were materials ordered or obtained?

If someone else placed the order, say so. Explain what information you supplied or how you checked what arrived.

What did you do if something was missing, damaged or wrong?

Explain the real reporting/replacement process and how you prevented the problem from causing unsafe or poor-quality work.

What tools, access equipment or specialist resources were needed?

Explain how you made sure the right equipment was available and suitable for the work.

Communication, changes and problems

Who did you need to communicate with?

Examples might include your supervisor, other electricians, site management, other trades, the client or delivery staff — only include people who genuinely applied.

Did anything change from the original plan?

If yes, explain what changed, why, who authorised it and how the change was communicated or recorded. If nothing changed, say so.

How did you deal with delays or other trades affecting your work?

Use a genuine example if you have one. Explain how you communicated and replanned within your responsibility.

How did you make sure the work could be completed without wasting time or materials?

Think about preparation, sequencing, checking information, having the right resources and raising issues early.

How to answer well

Keep it job-based

Refer to the actual documents you uploaded. It makes the discussion much easier and much more defensible.

Separate company paperwork from your actions

“The company issued the method statement; I read it before starting and followed the controls…” is better than claiming you wrote something you did not.

Final Unit 313 checklist

My job documents are uploaded to Assessment Evidence in OneFile.
I can explain the scope of the job and my role.
I can explain how I used drawings/specification.
I can explain the RAMS and company information relevant to me.
I can explain the programme / sequence of work.
I can explain materials, tools and resources.
I can explain communication with others.
I can explain genuine changes or problems — or say there were none.
Do not prepare made-up answers. These are common discussion areas so you can think about the job beforehand. Your PD should still be your own explanation of genuine work.